Carbon Border Adjustment Mechanism (CBAM) compliance for exporters of cement and clinker to the European Union, worldwide, and for the EU importers who declare them. Embedded emissions calculated from installation data, CBAM reports prepared for verification by accredited verifiers, and certificate exposure estimated and managed, as one accountable engagement delivered from Mumbai.

Cement and clinker · CN 2523Direct and indirect emissionsWorldwide delivery

Reviewed by Team GreenSutra · Updated 20 July 2026

On recordCovered groupCementCN coverageCN 2523 · 2507Emissions countedDirect and indirectDefault valuesBy country of originDe minimis50 t per importer a yearMarketsTürkiye
01

What CBAM means for cement exporters

Cement trades regionally, and the largest CBAM exposed suppliers sit around the Mediterranean.

The Carbon Border Adjustment Mechanism (CBAM) prices the carbon emissions embedded in imported goods, and cement is one of the six covered product groups, covering clinker and finished cement. The European Union imported about 11.3 million tonnes of cement and clinker in 2024, so the definitive regime, which has applied since 1 January 2026, reprices market access for the major supplier countries.

Because cement is heavy and low in value, it trades regionally: Türkiye supplies around two fifths of EU imports, North Africa a further third, and Ukraine much of the rest, while India is a negligible supplier since its cement ships to nearer markets. GreenSutra works as a CBAM consultant for cement exporters and the EU importers and authorised declarants who file for them.

Exposure tracks the clinker content and the country of origin. The table below shows the leading suppliers of cement to the EU and how CBAM bears on each.

EU cement and clinker imports and CBAM exposure, leading suppliers (2024)
MarketShare of EU imports, 2024CBAM exposure
TürkiyeAround 39 percent, the largest supplierThe most exposed by volume, on a higher carbon thermal energy mix.
UkraineAround 14.5 percentA significant clinker and cement supplier, exposure set by the specific plant.
AlgeriaAround 14 percentModern kilns; efficient plants sit below the default estimate on verified data.
EgyptAround 9 percentGas fired kilns, exposure set by the clinker carbon intensity.
TunisiaAround 8 percentNorth African supply, exposure set by the specific installation.
IndiaNegligibleCement ships to nearer markets, so India has near zero direct EU cement exposure.

Import volumes from Eurostat and Cement Europe, 2024. Cement counts both direct and indirect emissions, and clinker carries the bulk of them, so the clinker content of a product drives its exposure. The CBAM cost of any specific plant turns on its clinker carbon intensity and verified emissions, so the figures above frame exposure rather than fix a bill. A first step is the structured CBAM discovery brief, after which exposure feeds the CBAM cost calculator. The full deadlines and methods are set out in the CBAM compliance guide.

02

Cement products and their default values

The India default embedded-emissions values that apply where verified data is not supplied.

Coverage follows the combined nomenclature (CN) code of each good, from clinker through grey and white Portland cement to aluminous cement. The India defaults below count direct and indirect emissions, and each carries a mark-up of 10 percent in 2026, 20 in 2027 and 30 from 2028.

The representative values below span the cement range. Each is a single country-of-origin default; the figure for a specific product turns on its clinker content and, where supplied, the plant verified emissions.

Reading down the table, the grey and white Portland cements cluster near 1.45 tonnes of CO2e per tonne, while aluminous cement sits well above at 2.29. Because cement ships in high volume and the definitive regime prices both direct and indirect emissions, even that spread moves a certificate position at scale, before verified plant data is brought in.

India default embedded-emissions values, representative cement products
ProductRepresentative CNIndia default (tCO2e/t)
Grey cement clinkerCN 2523 10 001.44
Grey Portland cementCN 2523 29 001.48
White cement clinkerCN 2523 10 001.41
Aluminous cementCN 2523 30 002.29

Values are the India totals of direct and indirect emissions, specific to the country of origin, so the set differs elsewhere. Source: Implementing Regulation (EU) 2025/2621, Annex I. Clinker carries most of the embedded carbon, so a cement with a lower clinker factor carries less. Estimate a specific product, volume and route in the CBAM cost calculator.

03

How a cement CBAM engagement runs

From exposure assessment to a prepared, declared and managed certificate position.

Consultant mapping cement export goods against the European border on a wall chart
01

Assess CBAM exposure

Cement and clinker products, CN classification, clinker content, export destinations and volumes mapped against the definitive regime, the de minimis threshold and the authorised declarant requirement.

Engineer measuring embedded emissions at a cement kiln with a tablet showing emission factors
02

Calculate embedded emissions

Direct and indirect embedded emissions of each product quantified from actual installation and clinker data following the EU methodology, in place of default values that carry a mark-up, then prepared for verification.

Accredited verifier reviewing embedded emissions data on screen with cement goods bound for the European market
03

Prepare for accredited verification

Installation data and the monitoring methodology behind it prepared for confirmation by an accredited verifier, so the declared embedded emissions stand on evidence rather than marked up default values.

Compliance analyst before a CBAM registry ledger sharing verified emissions data with EU importers beside a night port
04

Report through the CBAM registry

Verified data shared with EU importers and authorised declarants through the central CBAM registry, and the annual declaration prepared so every covered consignment is accounted for.

Consultant reviewing CBAM certificate exposure under a desk lamp with a rising EU ETS price line and a falling emissions pathway
05

Manage CBAM exposure and reduce

Certificate exposure tracked against the EU ETS price, any carbon price paid at origin deducted, and a reduction pathway built to lower the clinker factor and the cost over time.

04

How CBAM works for cement

The border mechanism follows the embedded emissions of cement or clinker from the kiln across the European border to the certificate that is surrendered.

How CBAM works for cementTechnical drawing of the CBAM border mechanism for cement. A cement kiln in an exporting country, Turkiye shown, produces cement and clinker, among the six Annex I goods covered by CBAM. Direct and indirect embedded emissions are measured from installation data, verified by an accredited verifier and shared through the CBAM registry. The goods cross the European Union border past customs control, an authorised declarant files the annual CBAM declaration, and CBAM certificates priced off the EU ETS are surrendered, with any carbon price already paid at origin deducted.1122334455667788AABBCCDDEEFFREGULATIONCBAM REGULATIONOMNIBUS IIMPLEMENTING REGEU ETS LINKCEMENT KILN · TÜRKIYECEMENT · CLINKER01EMBEDDED EMISSIONSACTUAL OR DEFAULT02EU BORDERGOODS CROSS THE FRONTIER03AUTHORISED DECLARANTEU IMPORTER04CERTIFICATES SURRENDEREDPRICED OFF THE EU ETS05CEMS · INSTALLATION DATACEMENTMECHANISM SPINE · NTSEMBEDDED tCO2e · VERIFIEDBACTUAL DATADEFAULT VALUEEMBEDDED tCO2eDETAIL B · NTSTHIRD COUNTRYEUROPEAN UNIONCUSTOMS CONTROLANNUAL DECLARATIONCBAM REGISTRYREPORTING YEAREU ETS PRICEEUR/tCO2ePRICE PAID AT ORIGINDEDUCTEDSURRENDERKEYCONSIGNMENTSURRENDERDATA LINKDRAWINGCBAM MECHANISMSTATUSDWG NOGS·CBAM·02REVCDATE2026·06
01Installation · clinker kiln

A kiln produces clinker, the emission heavy intermediate, from which cement is ground. Most of the embedded carbon comes from the chemical calcination of limestone and the fuel burned in the kiln.

02Embedded emissions · direct and indirect

Both direct process and fuel emissions and indirect, electricity related emissions are counted for cement, measured from installation data or estimated with a country and product specific default value that carries a mark-up.

03Verified and shared

An accredited verifier confirms the actual data, which is shared with the European importer through the central CBAM registry.

04Border · declarant

The good crosses the European border, where an authorised CBAM declarant reports the embedded emissions for the year above the 50 tonne de minimis.

05Certificates surrendered

CBAM certificates are surrendered for the embedded emissions, priced off the EU ETS, with any carbon price already paid at origin deducted.

Direct and indirect embedded emissions are measured at the kiln, verified and shared through the CBAM registry, then declared at the European border by an authorised declarant who surrenders certificates priced off the EU ETS. Cement counts both direct and indirect emissions, and clinker carries the bulk of them. First surrender, covering 2026 imports, falls on 30 September 2027.

Embedded emissions follow each cement product from the kiln to the European border, and a readiness review turns that path into a measured, verified compliance plan.

Request a CBAM readiness review
05

What CBAM readiness earns a cement exporter

The gains of moving from marked up default values to verified installation data.

B·01

Market access retained

Verified embedded emissions data keeps cement and clinker moving into the European market under the definitive regime without compliance friction.

B·02

Lower certificate cost

Actual verified data replaces the conservative default, so the certificate obligation reflects the real clinker factor and kiln rather than a penalty estimate.

B·03

Trusted supplier status

Sharing verified data through the CBAM registry positions the plant as a preferred supplier to European importers and declarants.

B·04

Decarbonisation advantage

A lower clinker factor and cleaner kiln lower embedded emissions over time, an advantage that grows as the payable share climbs toward 100 percent in 2034.

Cement goods crossing a port toward the European market beside a falling emissions trend line and a certificate
Verified data protects market access
06

CBAM for cement exporters, answered

Q·01Which cement products does CBAM cover?
CBAM covers cement as one of its six product groups, spanning cement clinker, white and grey Portland cement, aluminous cement and other hydraulic cements under combined nomenclature heading 2523, together with calcined kaolinic clays under 2507 00 80. Coverage follows the CN code of each good, so Annex I of Regulation (EU) 2023/956 is the reference for any specific product.
Q·02What are the CBAM default values for cement?
Default embedded-emissions values are specific to the country of origin and count both direct and indirect emissions for cement. For goods of Indian origin the default for grey cement clinker is 1.44 tonnes of CO2e per tonne, with grey Portland cement at 1.48, white clinker at 1.41 and aluminous cement at 2.29. Clinker carries most of the embedded carbon, so a lower clinker factor lowers the figure. Default values carry a mark-up of 10 percent in 2026, 20 percent in 2027 and 30 percent from 2028, published in Commission Implementing Regulation (EU) 2025/2621.
Q·03Does CBAM count indirect, electricity emissions for cement?
Yes. Cement, along with fertilisers, counts both direct and indirect embedded emissions under the definitive regime, unlike iron and steel, aluminium and hydrogen, which count direct emissions only. For cement the direct process and fuel emissions of the kiln and the indirect, electricity related emissions of grinding are both included when the certificate obligation is calculated.
Q·04Which countries are most affected, and where does India sit?
Cement trades regionally because it is heavy and low in value, so the largest suppliers to the European Union sit around the Mediterranean. Türkiye supplies around 39 percent of EU cement and clinker imports, North Africa through Algeria, Egypt, Tunisia and Morocco a further third, and Ukraine much of the rest. India is a negligible supplier because its cement ships to nearer markets, so its direct CBAM cement exposure is close to zero even though it is a very large cement producer.
Q·05How much will CBAM cost cement exporters?
The cost depends on the country of origin, the clinker content, the kiln fuel and grid, the volume and the import year, and the payable share rises from 2.5 percent of the certificate obligation in 2026 to 100 percent in 2034. Because published per tonne cost figures rest on assumptions about clinker content and the certificate price, a specific position is best estimated year by year rather than taken from a single headline number. The CBAM cost calculator estimates a specific product and volume.
Q·06Does verified data really lower the CBAM cost for cement?
Usually, yes. Default values carry a mark-up and reflect a conservative estimate, while verified actual installation data reflects the specific kiln and clinker factor. A modern kiln with alternative fuels and a lower clinker cement can declare below the default on verified data, so the certificate obligation reflects the real plant rather than a conservative proxy.
Q·07Who verifies the emissions data, and can a verifier in India do it?
The final CBAM declaration must be verified by a verifier accredited under the EU CBAM accreditation rules set out in Commission Delegated Regulation (EU) 2025/2551. An accredited verifier in India, such as a body accredited by NABCB under the Quality Council of India to ISO 14065 and ISO/IEC 17029, supports and assures the underlying data, but does not by itself replace EU CBAM verification. GreenSutra works as a CBAM consultant that calculates and prepares the data for that verification; it is not itself the accredited verifier.
08

Request a CBAM readiness review for cement

A short conversation about cement and clinker products, clinker content, export volumes and the European buyers involved turns into a tailored CBAM plan. Schedule a call directly or send a written brief.

01Schedule a call

Pick the service and a slot; a practitioner takes the call.

02Write to us
Contact Us
Preferred reply channel

CBAM for cement embedded emissions calculated and certificate exposure managed for exporters and EU importersRequest a CBAM readiness review